General Conditions at ~$4,500/week seems high. If the GenCond number includes insurance, 
bonds, etc then I'm less offended. Hard costs of $77.81/SF looks pretty good. 


Robert Buente 
President/CEO 

1010 Development Corporation 
1001 South Hope Street 
Los Angeles, CA 90015 


213-749-0214 x202 


bbuente@1010dev.org 


From: Ellen Riotto <ellen@southpark.la> 

Sent: Tuesday, May 22, 2018 11:43 AM 

To: Daniel Taban <daniel@jadeent. com> ; Robin Bieker <robin@biekerco. com> ; Channing Henry 
<channing@almadevelopment. com> ; Robert Buente <bbuente@lO10dev.orq> 

Subject: FW: GC Recommendation 


FYI got our first quote back from a GC for the build-out. 


I'll save you from having to open the file: $525k 


I'll pass along the other quotes as they come in. 


From: Robin Bieker < robin@biekerco. com <mailto: robin@biekerco. com> > 
Date: Monday, May 21, 2018 at 5:05 PM 

To: Ellen Riotto < ellen@southpark.la <mailto:ellen(asouthpark.la> > 


1 of 7 


10/19/2018 08:58 AM 












RE: GC Recommendation 


Subject: FW: GC Recommendation 


From: Joel Stensby [ mailto : j oelstakprsinc . com ] 

Sent: Monday, May 21, 2018 10:32 AM 

To: Robin Bieker 

Cc: Assaf Nachshon 

Subject: FW: GC Recommendation 


Robin, 

Attached is a first draft. Many assumptions went into it. 


We are available for a review. 


Thx 

Joel 


<http://www.kprsinc.com/> 

License # 751130 

<http://www.facebook.com/paqes/KPRS-Const ruction-Services-1nc/165880880110824> 

Joel Stensby 
714 364-6601 direct 
714 612-1087 mobile 
714 672-0800 main 
714 672-0871 fax 

ioelsgkprsinc.com cmailto:joelsgkprsinc.com> 


From: Assaf Nachshon 

Sent: Monday, May 21, 2018 6:01 AM 

To: Joel Stensby < j oelsgkprsinc.com <mailto:joelsgkprsinc.com> > 
Subject: RE: GC Recommendation 


2 of 7 


10/19/2018 08:58 AM 









RE: GC Recommendation 


Joel, 


Here's our first pass. 


Our assumptions: 


Demo - complete interior demo, no abatement. We are 
currently. I googled the building and it looks very 
imagine they have an acoustical ceiling inside. 


assuming 
low with 


it's an exposed ceiling 
bowed trusses. I can't 


Sawcut, break, remove - we are relocating the restrooms and will need to move utilities. 
We also assumed one floor tele/data/power in the conference room. 


Steel - we made an assumption that the new sliding glass wall will require some overhead 
steel support. We also have minimal steel for the countertops in the restrooms. 


Finish carpentry - we assumed solid surface countertops in the restrooms. We assumed 
plastic laminate casework for the kitchenettes with solid surface countertops. 


Insulation - we carried insulation in new walls. 


Roofing - we will have some patching at new exhaust fans for the restrooms. 


Doors - to be solid core doors, western integrated frames, standard hardware (no glass or 
herculite doors) 


Glass - glass wall in office 102 to be framed, 3/8". Sliding glass wall assumed to be La 
Cantina type or equal. 


Drywall - assumed walls to be full height (open ceiling concept). Drywall ceiling in 
restroom. Drop down soffit at sliding glass wall. Level 4 finish throughout. 


Ceramic Tile - assumes tile floors and 5'-0" wainscot in restrooms. 


3 of 7 


10/19/2018 08:58 AM 



RE: GC Recommendation 


Acoustical Ceiling - none. We assumed an open ceiling concept. 


Flooring - we have included an allowance of $36/sy throughout the space. 


Paint - we are painting all new surfaces and exposed ceilings. 


Fire sprinklers - we are including relocating heads as required, although I'm not sure the 
building is sprinklered. 


Plumbing - we have included 2 new kitchenettes and new plumbing fixtures in new restrooms. 


HVAC - we assumed we are re-distributing ductwork only. No new equipment is included. 


Electrical - we assumed all new distribution from panels. All new lighting throughout in 
open ceiling space plan. 


Schedule - we have assumed a 12 week construction duration, (predicated on the glass wall 
lead time) 


Please let me know if you need anything else. 

Thanks - 

Assaf 


<http://www.kprsinc.com/> 

License # 751130 

<http://www.facebook.com/paqes/KPRS-Const ruction-Services-1nc/16588Q880110824> 

Assaf Nachshon 

Director of Preconstruction Services 


4 of 7 


10/19/2018 08:58 AM 




RE: GC Recommendation 


714 364-6617 direct 
714 381-8796 mobile 
714 672-0800 main 
714 672-0871 fax 

assafn@kprsinc.com <mailto:assafn@kprsinc.com> 


From: Joel Stensby 

Sent: Saturday, May 19, 2018 6:42 AM 

To: Assaf Nachshon < assaf ngkprsinc.com <mailto:assafn@kprsinc.com> > 
Cc: Robin Bieker < robin@biekerco.com <mailto:robin@biekerco.com> > 
Subject: Fwd: GC Recommendation 


Assaf, 

See below and attached. They need a price. Please follow with Robin on questions. 


Thx 

Joel 

Sent from my iPhone 


Begin forwarded message: 

From: Robin Bieker < robin@biekerco.com <mailto:robin@biekerco.com> > 
Date: May 18, 2018 at 5:38:03 PM PDT 

To: 'Joel Stensby 1 < j oels@kprsinc.com <mailto:joels@kprsinc.com> > 
Subject: FW: GC Recommendation 

Joel, 


Here is the space requirement. Ellen informed me that she needs the quote prior 
to submitting the lease proposal. 


Please forward to your TI guy that you introduced me to yesterday via text. 


Thanks again. 


Robin Bieker 


5 of 7 


10/19/2018 08:58 AM 












RE: GC Recommendation 


From: Ellen Riotto [ mailto: ellen@southpark. la ] 

Sent: Thursday, May 17, 2018 4:33 PM 

To: Robin Bieker 

Subject: FW: GC Recommendation 


SPBID is looking at new office spaces, and before we submit any official offer 
letters, I need to get a quote from a GC on the anticipated TIs. I'm attaching the as-is 
plans for a building on Hope, as well as the space plans put together by an architect. Is 
this something you have the bandwidth/interest to work on? 


Thanks in advance, 


Ellen 


Ellen Riotto 
Executive Director 


— imageOOl.png 


Ekprs 


— image002.jpg 


(find 


us on 


i mag e 003.jpg 


(find 


us on 


6 of 7 


10/19/2018 08:58 AM 










RE: GC Recommendation 


—Attachments:- 

imageOOl.png 

image002.jpg 

image003.jpg 


3.2 KB 
1.8 KB 
1.7 KB 


7 of 7 


10/19/2018 08:58 AM